Evergreen Container Ship Runs Aground in Chesapeake Bay! Vessel Schedule Delayed!
C
CGMIMM Import
March 15, 2022 · 6 views

EvergreenContainer Ship Runs Aground in Chesapeake Bay
From: https://stusupplychain.com/cntr-ship-runs-aground-in-chesapeake-bay.html \"At around 0015 UTC on March 13, a 12,118 TEU container ship named \"EVER FORWARD\" of Evergreen ship runs aground in Chesapeake Bay channel shortly after leaving the Port of Baltimore. The container ship, which was loaded with Chinese cargo, is still stranded as of now and its schedule has been delayed\".


